This project was completed on Sept. 01, 2000. The structural steel was purchased by our customer and we fabricated the runways and cranes on site, they also purchased all the crane components and we assembled them.

Our customer was able to save a considerable amount as their buying power was greater then ours.

 

The cross beams are clamped to the existing W4 x 13 beam stubs welded to the building columns

The runway beams are then clamped to the cross beams.

After assembling the 1-ton cranes and installing the 1-ton air hoists, the cranes are installed on the runways.